24hr Solutions drains team called out to a failed pump station in Barnet.

24hr Solutions Drains Team were called out to a drains failure as a main pump station failed and pump burnt out.

Within 30 minutes of the call 24hr Solutions drainage team were onsite to investigate. Accompanied by our DAF tanker and jetting van, confined space team and fluid pump unit, the team set up onsite and cleared the drains, pump station and diagnosed the problem.

With a burnt out pump, the unit was removed and taken back to the 24hr workshops for repair leaving the tanker on standby should the station reach a high level.

As you would expect, the pump was replaced and installed, tested and certified along with some minor remedial works that make the station more efficent and less likely to breakdown in future.

A spokesman for the site said 'Thanks for all your help, your all amazing - and thanks for going the extra mile (and into the hole), great job as always'.